Text

HARP Improvements

2012
Repair walking trail between Concession stand and Scout house.
New walking trail from the end of playground to pavilion.


2011
Repair the tennis court cracks, fix low spots and resurface 
Three new bleachers at Field #1
Field #3 leveled and re-seeded
New Bigfoot Sliding Board at the playground

2009
Gym Walls Refurbished
New Dugouts and backstop at Field #1
Pave the Camelot Court parking lot
Add two Rough Riders to the upper playground

2008
Project #2
Community Building Addition & Renovation
Add an addition onto the front and side of the building
Add a small meeting room (estimated to hold up to 30 people)
Add a residential kitchen (stove, refrigerator, cabinet space)
Add a unisex, handicap accessible bath room
Relocate/Expand the Recreation Board office
Install floor/walls/ceiling to the basement and create additional storage
Install Air Conditioning to the main building and to the additional section
Install a new main entrance with a handicap/wheel chair ramp.
Improve the accessibility to the side entrance for handicap/wheel chair access
Paint the ceiling of the main building
Replace the main ceiling lights in the main building
Relocate storage of cleaning supplies to a new supply closet.

2007
Project #1
Relocate lower fields #3 to resolve a water/sunlight problems
Add a walking trail around Fields #2/#3 (1/4 mile)
Add a pavilion and tot lot near Field #3 and the parking lot
Replace the storm water drainage area between Field #2 and the Practice Soccer Field (near Rt. 851)
Replace the basketball rims/nets @ Camelot Court
Remove old dead trees along Rt. 851
Replace the nets destroyed by vandals
Painting of the fences around the facility (FYI: There are 566 Sections of fence at this facility and a section is 5 feet high and 10 feet long)

2006
Replaced the park benches in the playground
Installed Barbeque Grills near the pavilion
Resurfaced the floor in the concession stand
Replace/upgrade playground equipment, install new see-saw
Upgraded outdoor lighting around the facilities
Installed new outdoor lighting on the scout house
Replaced the window shelves/ledges at the concession stand
Painting of the wood poles around the property
Replaced the siding on the Scout House

2005
Walking Trail paved and expanded
Paved the upper parking lot near the Community Building
Installed lights at Camelot Court Parking

2004
New playground equipment at Camelot Court Ball field
Begin fertilization, aeration of the fields program to improve the fields

Funding for these projects has been provided by:
- Department of Conservation and Natural Resourced Grant
- York County Government / York County Commissioners
- Hopewell Township / Hopewell Township Supervisors
A special Thanks to Home Depot/Shrewsbury who provided free labor and the technical support for this project.

 

 

Walking Path Distance

Track Your Distance

The walking path that circles Field #2 and Field #3 is approximately 0.38 of a mile per lap.